
Upper Corners Rebuild Fund
Every contribution, big or small, goes straight into tools, materials, and the hours needed to get boots (and diggers) on the ground.
Eligibility: Donations can be made by individuals over the age of 18 or those who have parental consent.Tax Deductibility: Donations to Rotorua Trails Trust are eligible for tax deductions under New Zealand tax law, provided you receive a receipt.
YOU WILL BE ISSUED A SUITABLE RECIEPT WITH YOUR DONATION.
This is in accordance with the Income Tax Act 2007. The receipt will be issued after your donation is processed.
Non-Refundable: Donations are non-refundable. All donations will be used to rebuild "UPPER CORNERS" specifically and if excess funding is received it will support ongoing trail maintenance.
If you encounter an issue with your donation, please contact us directly for assistance. info@rotoruatrailstrust.co.nz
Charity DetailsLegal name of the Charity: Rotorua Trails TrustRegistration number: CC52100NZBN number: 9429043296293
$0 raised
0 donations
0%
Amount
$20
$50
$100
$200
Other
0/100
Comment (optional)
WHAT?
Upper Corners
Grade 3
Downhill MTB Trail
Starting from the Old Shuttle Drop Off, Upper Corners will wind its way down through the upper reaches of the forest offering incredible broad vistas over Rotorua's lakes, geothermal areas, and the volcanic domes of Mt Tarawera (make the most of those views for the first 5ish years eh!).
True to the Corners name, expect a run of big, flowing berms and traverses that make a big hill last much longer than you'd expect — fast, swoopy, playful rollers and grin-inducing fun all the way down.
100% Pure Rotorua Goodness!!
From there, it links into the original Corners trail, continuing the twisting, grade 3 goodness all the way to the shuttle pick up — one continuous run from the top of the forest right down through some of Whaka's most-loved terrain, all grade 3!!
A professionally built digger trail, Upper Corners is going to be an epic addition to the network — the kind of trail riders talk about for years to come. Ideally it will have a 20-year lifespan, and offer hundreds of thousands of riders a spectacular experience.
Specs:
LENGTH
1km
STYLE
Digger built flow track
START DATE
TBC (need to get it funded first eh!)
OPENING DATE
(ASAP please, funding allowing!)
